23 questions to ask before you sign a garden room quote

Garden room quotes vary a lot in what they include. Use these questions to put every quote on the same footing before you pay a deposit. Jump to the printable checklist.

1. What exactly is included in the price?

  1. Is the base or foundation included, and what type is it? Firms differ: concrete slab, steel screw piles or ground screws. For example, Rubicon and Garden 2 Room build on steel piles, Garden Rooms by Creative on a concrete base, and Noah includes the foundation on some ranges but not on its entry range.
  2. Is delivery included, and is there a distance limit? Some firms state a radius, for example Apex (70 miles of its Haywards Heath base), Noah (150 miles of Telford) and Rubicon (60–70 miles of Chester).
  3. Is the electrical connection to the house included? Internal wiring and the cable run from your consumer unit are different jobs (see section 3).
  4. Is VAT included? Some firms quote "+ VAT". VAT is charged at 20%.
  5. What's the internal finish? Plastered, lined boards, flooring, skirting and decoration. Is anything left for you to do?
  6. Are heating, lighting and data cabling included? Is there a heater, how many sockets are there, and is wired internet included or extra?
  7. Who clears the site and removes waste? That includes an old shed, spoil from groundworks and packaging.
  8. Is the price fixed after the survey? What could change it, such as ground conditions, access or a slope?

2. Planning and building regulations

  1. Does the design fall within permitted development for my property? In England, the limits for outbuildings on houses include a 2.5m maximum height within 2m of a boundary, single storey only, nothing forward of the principal elevation, and no more than half the land around the original house covered (Planning Portal). Some councils point out that the height includes any raised base (St Albans City and District Council).
  2. Is my home on designated land or a listed building? Conservation areas, National Parks, AONBs and World Heritage Sites have tighter rules, and listed buildings always need permission for outbuildings.
  3. If planning permission is needed, who prepares and submits the application, and is that included?
  4. Will it need building regulations approval? Usually not for a building under 15m² with no sleeping accommodation. For 15–30m², usually not if it's at least 1m from every boundary or built substantially of non-combustible materials (Planning Portal). Any sleeping use changes this.

3. Electrics

  1. Who installs the new circuit from the house, and are they registered with a Part P competent person scheme? A new circuit to an outbuilding is notifiable work in England and Wales. A registered electrician can self-certify it; otherwise it must be notified to building control (IET).
  2. Will I get the electrical installation certificate and building regulations compliance certificate? Keep them for when you sell.
  3. Is the trench and armoured cable run priced for the actual distance to my consumer unit? Will my consumer unit need upgrading?

4. Guarantees and insurance

  1. What does the guarantee cover, and for how long? Published guarantees range from 10 years (common) to 12, 20 and 25 years. Read what's covered. Rubicon, for example, splits its guarantee into 20-year structure and roof membrane, 10-year cladding, and 12 months for fixtures and fittings.
  2. Is the guarantee insurance-backed? In other words, does it still pay out if the firm stops trading? Some firms say so, such as Garden 2 Room and Read Garden Rooms. Ask for the insurer's name and the policy document.
  3. Is my deposit protected? Garden 2 Room, for example, says its deposits are insurance-backed.
  4. Is the firm a member of a trade body or a dispute resolution scheme? Check any membership claim on the trade body's own website.

5. Money, timing and your rights

  1. How much is the deposit, and when are the other payments due? Deposits vary widely. Booths, for example, says £100 secures an office installation date. Avoid paying the full amount long before delivery.
  2. What's the lead time, and how many days will they be on site? Published examples include "5 to 10 working days on site" (Garden 2 Room), "10–15 day period" (Rubicon) and "4–6 weeks from order to installation" (GTS).
  3. What are my cancellation rights? Citizens Advice says that if you arranged the work away from the firm's premises (at home, by phone or online), you get a 14-day cooling-off period. It also says made-to-measure items may not automatically get one, and many garden rooms are made to measure. If you arrange the work at the firm's premises, cancelling after you've agreed a contract may cost you (Citizens Advice, England). Get the firm's cancellation terms in writing.
  4. Can I see a finished room or speak to a past customer nearby? Many firms have show sites or showrooms. Our directory notes where they're based.
Red flags: pressure to sign on the day, a "today only" discount, a large deposit long before manufacture, or no written cancellation information. If something feels wrong, Citizens Advice's consumer helpline is 0808 223 1133. In Northern Ireland, contact Consumerline.

Printable checklist

Print this page (Ctrl+P or Cmd+P). The site header and footer are hidden when printed.

Sources

  1. Planning Portal: Outbuildings: planning permission and building regulations (accessed 20 Nov 2026)
  2. St Albans City and District Council: Advice on outbuildings (accessed 20 Nov 2026)
  3. IET: Part P FAQs (accessed 20 Nov 2026)
  4. Citizens Advice: Cancelling building or decorating work (England; accessed 20 Nov 2026)
  5. Firm websites (accessed 20 Nov 2026): Rubicon, Garden 2 Room, Garden Rooms by Creative, Noah, Apex, Read Garden Rooms, Booths, GTS, Timberventure